If you want to follow the build
Start with The Thesis, then the six theses — they are the factory’s actual originality; everything else is their construction. The station pages show the system as it runs today, each claim traced to its source. The library grows as the plant does: the standard work carries a changelog, and so does everything germline, so the history of every change is part of the record.If you want to borrow the system
Take it. The ideas here are load-bearing without the plant attached:- Write the work order before the unit, and make the mission paragraph state intent, never method.
- Write the eval before the agent — the gauge before the part. If the acceptance criteria cannot become an eval, the unit is unmanufacturable, and better to learn that on paper.
- Give every claim an expiry. Whatever you verified, the world under it is moving.
- Wire an andon for silence: list your recurring obligations, name the artifact each one produces, and alarm on absence. A cron that ran is not a cron that worked.
- Compile your doctrine. Any rule you care about becomes a script, a schema, or a gate; rules as prose hold about half the time, rules as scripts hold.