The station where thinking is cheapest. Design turns a conforming work order into a buildable specification — and writes the gauge before the part exists.

Entry gate

A work order that passed Station 0’s schema gate: Why linked to higher intent, testable acceptance criteria, declared family, target cost, named principal.

Standard work

Spec and identity are written here — tamazukuri, in the order the manifesto demands:
  • For agents: the soul document before the tools. Identity is a stamped structural part, the first line on the bill of materials — not a coat of paint applied late.
  • For tools: the interface contract before the implementation.
  • For skills: the description-and-boundary block before the procedure.
Then the structural rule that defines this station: the eval is written before the unit. Toyota builds the gauge before the part; eval-driven development — write the eval before the agent can pass it, because eval quality is the ceiling on agent quality — is the same discipline. A unit whose acceptance criteria cannot be expressed as an executable or judge-scorable eval is not underspecified; it is unmanufacturable, and Design is where that gets discovered, not Verify. Design also drafts the bill of materials: which registry parts, which model tier per step, with reuse checked before any new fabrication is authorized — the shelf is searched before the forge is lit.

Exit gate

Four checks, all present or the unit stays:
  1. The eval exists and currently fails — red, because the unit does not exist yet. A green eval at Design is a broken eval.
  2. Draft bill of materials: which parts, which model tier per step.
  3. Projected cost within the work order’s target.
  4. For agents: soul and contract documents drafted.

Escalation

Unmanufacturability is this station’s discovery, not its failure. When acceptance criteria cannot become an eval, the order returns to intake for sharpening with the principal — block before guess.

Enforcement

Row 2 of the compilation table: a gate script — Design cannot exit without a red eval on record. This gate is scheduled in the design’s construction plan (Phase 2, built as the pilot units demand it) and is not yet compiled; until it lands, the check runs as review discipline against the exit list above. This page states the standard; the script, when it lands, merely makes it unskippable.

Self-audit

ClaimSource
Tamazukuri ordering: SOUL before tools; contract before implementation; boundary before proceduredocs/factory-design.md:105
Identity is a stamped structural part, first line on the BOMdocs/factory-design.md:79
Eval before the unit; unmanufacturable if criteria can’t become an evaldocs/factory-design.md:107
Exit gate: red eval, draft BOM, projected cost in target, SOUL/CONTRACT drafteddocs/factory-design.md:109
Row 2: gate script “Design cannot exit without a red eval”; compiled JIT in Phase 2docs/factory-design.md:195, 269
Block before guessdocs/factory-design.md:184